Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Shielded |
|
| Number of Leads |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Minimum Shelf Life |
|
| Sterile OR Non-Sterile |
|
| Use with Other Supplies |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Shielded |
|
| Number of Leads |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Minimum Shelf Life |
|
| Sterile OR Non-Sterile |
|
| Use with Other Supplies |
|
You are about to visit a Philips global content page
Continue